Sunday, January 27, 2013

Perimeter tiles installed


An afternoon of cutting to fit filled in the remaining gaps on the floor.  Next step will be grouting.  That step is the subject of some discussion.  Current thinking is to tile the sides and top it with some boards that were taken up from the previous porch floor or to use some of the wide boards we saved from the second story project.  Stay tuned.  Once the floor is done the ceiling will go up and the walls will get wainscotting and drywall.