I know it doesn't look like a big job, but the step that we threw into the hole bottom side up needed to be chiseled flat. So over two days I sledge hammered and chiseled off the rocks on the under-bottom of the step. Then we raked and raked until the surface was flat.
Brad and Steve added the forms of plywood and 2x4's to the outside to get ready for the foundation.
No comments:
Post a Comment