Halloween is over and we're back to work getting ready for the electrical installation. We decided to remove all the sheathing to make it easier to put up the drywall. This involved removal of a lot of blown in insulation done when the second story project was accomplished. One shot shows the very old with the new of the second story project - that is a dead space created to run the plumbing and shore up the floor beams that had hacked into previously. The string represents a chase for the electrical to run up from the basement. The open spot on the end wall is a hollow area between the formal front door and the outside wall. This is where the treasure was found. More on that to come soon.